加勒比中文字幕无码一区-女主和前任各种做高h-亚洲成a人片在线www-西西人体大胆尺度写真-91插插插永久免费-精品国产99-性生交大片免费看女人按摩摩-国产成人视屏-免费a级网站-欧洲做受高潮免费看-午夜伦理一区-精品国产自在精品国产精华天-综合国产视频-日本一区二区不卡在线观看-精品国产乱码久久久久久浪潮-午夜免费国产体验区免费的-米奇av-国产精品理论在线观看-久久成人啪啪性教育-中文字幕在线欧美

Language EN
News Center
NEWS
Talk about several aspects that need to be paid attention to during the drilling process of water well drilling rigs
Date:2021-05-11 Page View:10996

The drill bit plays a pivotal role in the drilling process of water well drilling rigs. The quality of a drill bit directly affects the efficiency of water well drilling and the quality of the hole, so we need to pay attention to the selection and use of the drill bit. During the drilling process, the operator should pay attention to the drilling usage of the drill bit to make the drill bit better for production operations. Several aspects that need to be paid attention to in the drill bit of the water well drilling rig:   


   1. After the drill bit of the water well drilling rig is drilled into the structure, the center drilling tool needs to be replaced in time. First, the bottom of the hole needs to be cleaned, and then the residue at the bottom of the hole is blown clean. The tool is slowly lifted up, and it is most suitable when the lifting force is just enough to lift the drill tool.  

 

   2. The drill bit of the water well drilling rig is summarized during the drilling process. It is also necessary to pay careful attention to the follow-up situation of the casing, to understand the specific situation in the hole in time, and keep the hole clean in time when necessary, and the drill bit in the water well drilling rig is on the drilling rig. During the process, strong lifting is prohibited.  


   3. Sometimes there will be more residual slag at the bottom of the hole of the water well drilling rig. The rotating part of the eccentric drill bit will be blocked by the slag, which will affect its gathering production. At this time, it is necessary to deliver compressed air and clean the hole again. , And make the down-the-hole hammer work for a short period of time, and then resume the lifting operation of the center drill.